BBACagenda2012-08-01

BBAC

  • 285 Great Rd: MassDOT letter review
  • MM Extension: review 25% design doc (CD)
  • Bicycle/Pedestrian improvements on Burlington Rd, Earl Rd to Meadowbrook
  • Transp. Comm report: Brian, Ralph
  • Police Logs: Ralph
  • Road issues report (potholes, crash scene cleanup, storm drains replaced incorrectly, etc.)
  • New business, events
  • Assign/review any action items
  • Adjourn

Friends

  • Higgs Boson impact on bicycling: Peter
  • School Transportation Policy: MAGIC, Bedford-Lexington
  • MM "Navigational Aids" DCR grant: Terry
  • Friends Recognition Awards
  • Bedford Day
  • General Bike News: Lexington, Arlington, LoAB, BFRT, Rails2Trails, MassBike, East Coast Greenway, CRW, Livable Streets, Boston Cyclists Union, Somerville "summit"
  • Assign/review action items
  • Adjourn

Notes

  • Billerica Rail Trail Support Letter
  • GreenDOT comments (Fri)
  • MM Ext design doc, 33 PDF files
  • 12' wide, 20 mph design speed
  • bushes, fences when necessary
  • RR ave, 4' shoulders, 6' sidewalk, 6" granite curbing
  • gen01 - gen25 ~ 1500 feet sections
  • gen06, mongo brook winchester dr connect
  • gen15 caesar jones
  • gen21 concord rd, east side
  • gen22 concord rd crossing, flashing beacon
  • gen23 concord rd, west side
  • gen24 town line, don't see access path to wheeler Dr
  • costs, overview files
Unless otherwise stated, the content of this page is licensed under Creative Commons Attribution-ShareAlike 3.0 License